Zheng R, Su C, Zheng Y. Two-stage flexible warranty decision-making considering downtime loss. Journal of Risk and Reliability 2020. 234(3): 527-535.
点击次数:
是否译文:否
上一条: Zheng R, Zhang Y, Gu L. Optimal post-warranty maintenance contracts for wind turbines considering availability. International Journal of Green Energy 2020. 17(7): 373-381.
下一条: Zheng R, Su C. A flexible two-dimensional basic warranty policy with two continuous warranty regions. Quality and Reliability Engineering International 2020. 36: 2003-2018.