Supervisor of Master's Candidates
E-Mail:53b04db9d55b3fada6d0fb420a56915bea6c8993c5bde46fcccc4941ba498189d7063379cc3bf7431ee79890d288f7d75ea74c511e74046191a04d49aeee1b897d50eb01bf0ca55ab0b222dbb881ceb73b0d760049ceeba61b17c82e32fe66f9724ac7ca24e2565a32f514c2c1d03c55cd979d2a7d5ab3524c9c8df1b8180eeb
School/Department:电气工程系
Education Level:With Certificate of Graduation for Doctorate Study
Business Address:逸夫楼818室
Gender:Male
Degree:Doctoral Degree in Engineering
Status:Employed
Discipline:Electrical Power System and Automation
Scientific Research
Research Field
No content
Paper Publications
- · Lei Wang, Lu Han, Liang Tang. Incentive strategies for small and medium-sized customers to participate in demand response based on customer directrix load:International Journal of Electrical Power and Energy Systems,2024,Volume 155
- · Lei Wang, Chenyu Yang, Zhilong Xu. Analysis of carbon electricity coupled market modeling method based on carbon credit trading mechanism:International Journal of Electrical Power and Energy Systems,2024,Volume 156
- · Lei Wang, Zhongwang Shi, Wei Dai ,et al. Two-stage stochastic planning for integrated energy systems accounting for carbon trading price uncertainty.[J:International Journal of Electrical Power and Energy Systems,2022,135
- · Lei Wang, Yichao Ma, Liuzhu Zhu, et al. Optimized operation study of load aggregator based on UCCP-IDR.[J:IET Generation, Transmission &Distribution,2022,16(12):2301-2313.
- · Lei Wang , Chaoqun Ma , Liuzhu Zhu , et al. Optimal Dispatch of Integrated Energy System Considering Integrated Demand Response Resource Trading.[J:IET Generation, Transmission &Distribution,2022,16(9
Patents
- · 王磊,马超群. 一种负荷聚合商参与的综合需求响应方法及系统Invent,2020111933671,2022/06/21
- · 王磊,戴巍. 基于动态碳交易模型的综合能源站随机规划方法及系统Invent,202011189052X,2022/11/15
- · 王磊,陶征轩. 一种基于区块链综合能源系统协调运行优化方法级系统Invent,2020111881592,2022/10/11
- · 王磊,侯崇琦. 考虑需求侧响应不确定性的综合能源系统优化方法及系统Invent,2020108027597,2022/12/09
- · 王磊,周建平. 综合能源系统多时间尺度优化调度方法、系统及存储介质Invent,2020109002968,2022/07/12
Published Books
No content
Research Projects
- · 国家重点研发计划. 大规模交直流混联电网全电磁暂态建模和仿真(2016年7月-2020年6月,182.01万元)
- · 国家自然科学基金.多类型分布式电源接入配电网规划与运行控制理论研究(2020年1月-2023年12月,252万元)
- · 国网安徽省电力公司科技项目. 适应能源互联网的配电网规划设计与运行控制技术研究(2018年1月-2019年12月,120万元)
- · 国网安徽省电力公司科技项目. 基于氢能、太阳能、风能的综合能源站多能源协调规划运行关键技术研究(2020年1月-2021年12月,90万元),2020/01/01
- · 国网安徽省电力公司科技项目. 能源消费侧脱碳关键技术及需求响应运行模式研究与应用(2022年1月-2023年12月,150万元)